Belzona in the Press Update: Leading Edge Repair and Protection

In May, Senior Copywriter, Chloe Hirst, wrote an article titled: Extend Lifespan of Wind Turbine Blades with New Leading Edge Repair and Protection Solution

The article discussed how, in response to growing market demandBelzona now offers a complete leading edge repair and protection solution. Optimised to be easy-to-apply, fast-curing and hard-wearing, the combination of Belzona 5711 and Belzona 5721 is specially designed to fortify wind turbine blades with outstanding protection against leading edge erosion for the long term.

Here is a roundup of all 21 publications that featured the news:
Hazardous Engineering Solutions
Engineering Maintenance Solutions
Composites World
Power and Energy Solutions
Renews Biz
Reinforced Plastics
Water Magazine
Wind Energy Network
PaintSquare
Lochaber Chamber of Commerce
JEC Group
World Wind Technology
PCE International
Industrial News
Offshore Engineering and Equipment
Thailand Construction News
Industrial Technology
Windpower Engineering and Development
Smartech Energy
EIC Inside Energy
Paint and Coatings Industry Magazine

To read the full article, please click here.

2-part leading edge protection coating, Belzona 5721, being applied in situ at a windfarm
2-part leading edge protection coating, Belzona 5721, being applied in situ at a windfarm

Interested in purchasing Belzona’s repair composites and protective coatings?


Subscribe to our blog

Contact Email  *
First Name *
County 
*Required Fields
Note: It is our responsibility to protect your privacy and we guarantee that your data will be completely confidential.

Leave a Reply